Resource Management

The Capacity Planning in ProjectSoft PM, allows both limited personnel and material resources to be deployed with strategic long-term planning, as well as the tactical and operational planning for departments throughout the entire organization. In tactical planning, a reservation can be made at a high level (based on job categories for personnel and standard equipment for material resources). It is only during the operational planning that the final alignment between the required personnel and material resources must be confirmed. The availability in a certain period takes into account the gross available capacity offset by allocation to other projects, leave/sick/absence and indirect productive matters. The material resources can take into account periodic and major maintenance and downtime. Links are provided with HRM/MM applications of third parties.